1
2
3
Whitelee Wind Farm Visitor Centre
Wind Tunnel and Energy Bike
Timeline: 2 months
Client: Scottish Power
Value: £15k
Aim: To upgrade the existing energy bike interactive and build a large wind tunnel exhibit
What we did: We replaced the electronics in the energy bike and gave the whole exhibit a face lift , on the wind tunnel we designed and prototyped the blower and control system. The tunnel was designed to transported in pieces and assembled on-site